Sunday, January 25, 2009

The Finishing Touches - Outside

We're into the homestretch of our renos - just putting on the finishing touches. Here are some photos of how things are shaping up on the outside.







Tuesday, September 2, 2008

A Labour of Love

Labour Day's behind us and as summer's coming to an end we're preparing our new home for the cold weather ahead with new doors, windows, insulation & gyprock throughout.























Friday, July 4, 2008

A Summer to Remember

Summer's here and we're working away on our new home amidst the green grass and sunny (& foggy) skies. Here's a look at the updates from the outside.







Friday, May 9, 2008

Spring Ahead

The warm weather is here and not only are things rejuvenating outside, but inside as well. Here's a glimpse into our budding office.










Wednesday, February 13, 2008

Some Concrete Progress, Literally.

Here's a look at our concrete pour - a solid foundation for our project.

















Thursday, February 7, 2008

Some News

We've got some updates on our adventure for those of you following our progress.

As of this writing we've got the scaffolding up on the outside, some rough plumbing in on the ground, and the concrete floor (and some of the wall) will be poured this week and next. We hope to begin framing within two weeks.

Some other exciting news is that we were able to secure the land next door, which will be a useful addition to this project.



















Monday, December 3, 2007

Reno Materials

The building is coming along and now we've turned our attention to reno materials. Below is a list of what we'll need for the project. Anyone interested in donating materials will help us reduce the eventual mortgage on the building and ongoing costs to the Loan Fund, which will allow more money to flow directly to our mission to help individuals attain self-sufficiency.

If you have materials to donate (whether you're a business, organization, or individual) give us a shout at 506.636.8549 or loanfund@nbnet.nb.ca.




MaterialsCoverageQuantity

Wall and Ceiling Cover
5/8 fire code gyprock6182 SF129 sheets of 4’x12’
1/2 gyprockk4920 SF103 sheets of 4’x12’
Paint – primer14000 SF35 gallons
Paint – ceiling2582 SF7 gallons
Paint – walls11418 SF29 gallons

Thermal and Moisture Protection
Wall insulation3800 SF
Ext Fire code Sheathing1200 SF
HardiPlank or Equal Cladding2800 SF
Tyvec2800 SF
Poly Vapor Barrier5000 SF

Doors and Windows
Ext Doors (Pre-hung) 1/2 lite
3
Interior Rated (20 mins) Doors (Pre-hung)
2
Vinyl Windows 32”x48” Double Hung
7

Interior Trims
Virold Baseboard500 LF
Door and Window Casings – Virold300 LF

Flooring
LVL 2 ply 1 3/4 “x11 1/2 “4 LF
LVL 3 ply 1 3/4 “x11 1/2”8 LF
VCT 1/8”400 SF

Cabinetry
4’ Closet Rod and Shelf
3 sets
Kitchen Cabinets (Uppers and Bases)25 LF

Bath and Kitchen Accessories
Toilets
3
Lavatories
3
5’ Tubs and Surround
2
Double Stainless Steel Kitchen Sinks
3

Wood
Pressure Treated Decking (10’x4”x1”)250 SF
Pressure Treated 4’x4’x12’posts
12
1/2 “ OSB
60 Sheets
2”x4”x12’
160 pieces
2”x4”x10’
60 pieces
2”x6”x12’
180 pieces
2”x12”x8’
60 pieces
1”x3”x10’ strapping
400 pieces
3/4 plywood
12 sheets